Skip to product information
1 of 6

Commercial Dual-Gun DC Fast Charging Station (60kW−120kW) with 55" Digital Advertising Screen

Commercial Dual-Gun DC Fast Charging Station (60kW−120kW) with 55" Digital Advertising Screen

Regular price KSh1,959,000.00 KES
Regular price KSh2,350,000.00 KES Sale price KSh1,959,000.00 KES
Sale Sold out
Shipping calculated at checkout.
Quantity

Transform your parking lot, gas station, hotel, or commercial building into a dual-stream revenue generator. The Commercial DC Fast EV Charger combines ultra-rapid electric vehicle charging with a high-brightness 55-inch HD advertising display, allowing you to collect charging fees while earning ad revenue from local businesses.

Key Features

  • Dual Revenue Stream: Charge EVs while displaying dynamic ads on a weatherproof 55-inch outdoor LCD display (2500 cd/m² ultra-bright outdoor visibility).
  • Rapid DC Fast Charging: Multi-power configuration (60kW−120kW) charges standard electric vehicles to 80% in 20–35 minutes.
  • Dual Connector Charging: Equipped with dual connectors (CCS2 / GBT / CHAdeMO) to charge two vehicles simultaneously.
  • OCPP 1.6J Smart Management: Seamlessly connects to your preferred payment gateway, mobile app, and fleet management software.
  • All-Weather Outdoor Durability: IP54-rated heavy-duty enclosure with smart forced air cooling built for tough outdoor climates.
  • Flexible Payment Integration: Supports Mobile Money (M-Pesa/Mobile App), RFID swipe cards, and online billing platforms.

Specifications

Feature Specification
Output Power 60kW / 90kW / 120kW
Input Voltage 3-Phase 400V ±15%
Connectors Dual Ports (CCS2 / CHAdeMO / GBT)
Ad Display 55" LCD Screen (2500 cd/m²)
User Display 8" LCD Touch Screen
Network & Protocols 4G / Ethernet, OCPP 1.6J
Ingress Protection IP54 (Outdoor Rated)
Operating Temp -30°C to +50°C
Dimensions & Weight 870×610×2037 mm (400 kg)

🚚 Shipping & Delivery (Kenya)

  • Delivery Window: 30–40 business days via sea freight with full customs clearance and doorstep transport.
  • Installation Note: Professional electrician site assessment required prior to installation (400V 3-phase grid connection needed).
View full details